Angang Metal Products

What files do you need for a fast quote, and what is your typical lead time?

Time:2026-09-10

A:

* RFQs: Please share 2D engineering drawings in CAD formats (DWG, DXF, or PDF) along with 3D models (STEP/IGES) if complex cutouts are involved. Please specify the base substrate, glass thickness, surface treatments (AG/AR/AF), ITO resistance/busbar layout (if applicable), silk-screen colors (Pantone/RAL codes), and estimated annual/batch quantities.

* Lead Times:

* Prototypes: Typically 7–10 business days after formal drawing sign-off. Complex quartz machining, laminated ITO assemblies, or custom busbar layouts usually take 10–15 business days.

* Mass Production: Standard turnaround is 2 to 3 weeks, with expedited production lanes available for urgent project schedules.

News Recommended